Specifications include, but are not limited to: The City of Palm Coast is seeking professional engineering services for design and construction plans for the replacement of the Surface Water Control Structure (SWCS) K-6 and the road crossing under Smith Trail. All plans and design documents are to be prepared with Standard English values in accordance with all applicable FDOT manuals and guidelines. Demolish and remove existing weir K-6, Seminole Waterway; remove existing triple 66” CMPs at Smith Trail and replace with concrete structures; rebuild weir K-6 either as a standalone structure with access from Smith Trail or a drop structure at the upstream end of the new concrete culverts; including all associated roadway, shoulder, utility work and associated appurtenances.