Specifications include, but are not limited to: A new 5’ wide sidewalk will be constructed along the south side of Sea Croft Drive as well as drainage improvements including ditches, culverts and storm sewer. A retaining wall will be constructed where limited right-of-way exists within the proposed roadway. The project will include utility relocations, paving, striping, and new signage. During demolition, the white pavers shall be removed, salvaged, and returned to the owner. The existing plantings and pine tree in the right-of-way shall be protected. (2") 220 LBS/SY SP - 12.5 ASPHALT (ROADWAY); (8") LIMEROCK BASE LBR 100 MIN (ROADWAY) ; (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (ROADWAY); (6") LIMEROCK BASE LBR 100 MIN (DRIVEWAYS/BRICK PAVERS); (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (DRIVEWAYS/BRICK PAVERS).