A. Demolition A. Exterior Demolition: 1. Remove existing roofing components to install a new asphalt shingle system. 2. Selectively demolish existing windows, walls, and parts of exterior walks, including removal of damaged wood elements such as siding, trim, and fascia. B. Interior Demolition: 1. Selectively demolish floors, walls, ceilings, fixtures, cabinets, pipes, ducts, electrical fixtures, and outlets. B. Construction and Remodeling A. Roofing and Exterior: 1. Install a new asphalt shingle roof with appropriate flashing, curbs, and trim. 2. Repaint and refurbish exterior siding, soffits, and trims. B. Entrances and Windows: 1. Construct new customer and employee entrances, add a new exterior customer service window, and install exterior slabs and railings as per the architectural drawings. C. Interior Layout: 1. Remodel the interior layout to provide five new customer service stations with necessary finishes, fittings, and fixtures. C. Mechanical, Electrical, and Plumbing (MEP) Systems A. Plumbing Upgrades: 1. Install new water closets, lavatories, sinks, and related fixtures. 2. Upgrade domestic water and waste systems, including new piping, water heaters, and floor drains.