Specifications include, but are not limited to: Complete demolition of the existing site: main building, weight training building, 50 meter with dive well pool and pump house, wading pool and pool deck. Addition of an all-new 25 yard (length) by 50 meter (width), 10 lane pool with a separate dive well and moveable bulkhead with traditional diving (two 1 meter and one 3 meter boards set-up). Addition of a new interactive zero to 2.5’ depth play pool with features below that feeds into a 3.5 – 4’ teaching pool; also featuring three flume slides going into the teaching pool. Addition of a new building structure(s) to house administration offices, ticketing, guard room, first aid room, weights training, and locker rooms and concessions. Creation of an adequate deck to host meets & have land drills. Artificial grass area for picnic tables and sound amplification throughout. Incorporating non-permeable shade structures such as: shade sail, large umbrellas or cantilevered shade structures on either side of 25 yard pool and near play/teaching pool and in grass area. Addition of a multipurpose party/classroom space with the capability of being subdivided into at least two smaller spaces. Increasing visibility of aquatic center by removing the existing perimeter wall and replacing it with a green buffer or transparent design element. Incorporating a new marquee sign visible along the main road with messaging capability.