Specifications include, but are not limited to: Plumbing services are required, but not limited to, the installation of water and/or wastewater service lines, the connection to the potable water system and/or the connection to the sanitary sewer system, the disconnect of the existing well system, and/or the abandonment of the existing septic tank(s). Materials Specifications Concrete: The concrete used shall be CLASS 1 (2500 psi in 28 days). Asphalt: The asphalt used shall be TYPE S-III (Asphaltic Hot Mix Pavement). Asphalt restoration shall consist of 1.5" minimum thickness. Sod: Replacement shall be made by matching existing sod type only. Fill: Clean fill shall be free from large lumps, wood, roots, rocks 3.5" and larger, building materials, or other extraneous materials. Water Service Pipe: Pipe shall be PVC water pipe, schedule 40, AWWA standard. Wastewater Service Pipe: Pipe shall be PVC gravity sewer pipe schedule 40, AWWA standard and shall be stamped with “DWV”.