Specifications include, but are not limited to: The initial project requires the design and permitting of a new 500,000 gallons per day (GPD) field-erected wastewater package treatment plant and approximately 0.5 miles of water and wastewater lines needed to connect to the existing Lake City utility lines at US Highway 90. The proposed plant design will need to demonstrate that the proposed plant layout will accommodate plant expansions in increments of 250,000gpd to an ultimate 1,000,000gpd to 1,500,000gpd plant capacity. The plant design will include connecting to the City of Lake City utilities approximately 0.5 miles north of where the plant will be located and providing access to the plant. The design and permitting of the WWTP shall include a water reuse. Plant operations and maintenance costs should also be a consideration of the design. The successful respondent should have experience with modifying consumptive use permits. The successful respondent will be responsible for acquiring all necessary permits and utilities for the successful construction and final operations of the new facility. The successful respondent will participate as the engineer of record in the bidding and the construction of the project by the owner. The scope of services to be performed shall consist of but not limited to the following: 1) General Planning 2) Design and Permitting of all types of Public Infrastructure 3) Water Treatment Facilities 4) Wastewater Treatment Plants 5) Gravity Collection System Analysis and Design 6) Wastewater Transmission System 7) Water Distribution 8) Pump Stations 9) Stormwater Management 10) Geotechnical Investigation 11) Site Planning, Design, and Inspection 12) Local, State, and Federal Permitting (stormwater, wastewater, consumptive use/reuse, wetland impact, etc.) 13) Architectural Services 14)Recreation Facilities 15) GIS services 16) Feasibility Analysis 17)Cost Estimating 18) Funding Research 19) Grant/Loan Applications 20) Any other related service that may be requested by Columbia County