Specifications include, but are not limited to: The Work consists of furnishing all materials, labor, and equipment necessary for the installation of turbidity curtains and approximately 1,500 linear feet (“LF”) of bulkhead including the steel sheet pile, concrete bulkhead, baywalk with stabilized limestone, pea gravel, concrete shell aggregate finish, and underground drainage, tree planting, relocation of select trees to an upland area within the park (per Tree Disposition Plan), drainage infrastructure including innovative treatment devices, kayak launch, solar lighting, seating benches, picnic tables, trash receptacles, irrigation, bike racks, signage, and other park amenities. The full Scope of Work is detailed in the construction drawings project documents.