Specifications include, but are not limited to: 1. Furnish, install and maintain all required BMPs to prevent erosion, sediment, or stockpiled debris from leaving the site. BMPs shall include silt fence along perimeter, tracking prevention at site entrance/exit, inlet protection within a minimum one block radius, and all other required BMPs to meet State and local NPDES requirements. Dust prevention measures shall be practiced. 2. Uproot and remove all orange trees and other vegetation located within the work area. 3. Mature trees of other species (i.e. oak, etc.) shall be left in place and protected from damage during clearing operations. 4. Separate and properly dispose of any irrigation pipes and infrastructure removed during the clearing. Care shall be taken not to damage adjacent property owner’s irrigation. Notification shall be given immediately and repairs made to any damage. 5. Material shall be burned onsite utilizing an air curtain and all other appropriate and applicable measures. Any permits required shall be the responsibility of the contractor.