Stencils and crosswalks shall match existing stencils. Any exceptions must be approved in advance by The Woodlands Township project manager. 52 New stencils shall be provided by The Woodlands Township for use on this contract ONLY. Contractor will be responsible for stencil replacement due to damage, loss, or failure to return the stencils in good condition within 2 weeks of project completion. 53 Contractor is responsible for maintaining a clean and safe construction area with suitable barriers to keep the public out of the area during stenciling. 54 Contractor will sandblast to removed existing stencils – words only. Stop bars can be cleaned and re-painted. Equipment will have integrated vacuum and all debris shall be properly removed in accordance with Clean Water Act, Section 301. 55 Cautionary Stencils and Crosswalk Striping shall be completed as follows: • Prepare area for paint application as needed sandblast with vaccum, etc.) • Stenciling of pathway access and egress cautionary sets, including 6 stop bars, (1) NO MOTORIZED VEHICLES ALLOWED and (1) SLOW INTERSECTION AHEAD on each set, using one coat of Sherwin Williams – SETFAST Acrylic Zone Marking Paint (10.13-White) or approved equivalent. Refer to APPENDIX E • Stenciling of parallel crosswalk stripes across the roadway, from path to path, using one coat of Sherwin Williams – SETFAST Acrylic Zone Marking Paint (10.13-White) or approved equivalent, with and application of reflective glass beads while paint is wet. Each crosswalk stripe to be 12” wide and match established standard.