a. Specific improvements include: a. Replace the roofing with matching simulated metal shingles or consider a standing seam metal roof without exposed fasteners. b. Upgrade all fascia boards with hardi-board fascia materials. c. Remove existing siding and trim, replacing them with the same shiplap profile using hardi cementous siding. d. Prior to installing new siding, insulate all exterior walls with blow-in insulation or foam. e. Remove and reinstall all exterior windows and door canopy/awnings with new canvas coverings. f. Pressure wash, seal, and/or stain all exterior decking and stairs. g. Professionally prime, caulk, and paint the entire exterior. h. Replacement of all exterior windows and doors as necessary. b. Pre-rehabilitation phase services by the Contractor include the following: a. Research historic appearance and elements (Historic photographs should be used to identify and preserve original finishes). b. Conduct a conditions assessment and report on the findings and recommendations for treatment. c. Detailed cost estimating and knowledge of marketplace conditions. d. Prepare rehabilitation plans, designs, specifications, and project planning and scheduling. e. Advise the City of methods to gain efficiencies in project delivery. f. Incorporate the owner’s sensitivity to quality, safety, and environmental factors. g. Recommend and select sub-contractors for the project. h. Bid project in accordance with the City of Fort Pierce and State requirements for procurement of subcontractor and supplier bids. i. Obtain all necessary building permits as required by the City of Fort Pierce. c. Rehabilitation phase services by the Contractor will include: a. Assure that the property remains secure during construction activities. b. Coordinate with the City, other government agencies, utility companies, and all other project stakeholders. c. Arrange for on-time procurement of materials and equipment. d. Schedule and manage site operations. e. Bid, award, and manage all construction related contracts while meeting City of Fort Pierce and State requirements for procurement of subcontractor and supplier bids. f. Provide quality controls. g. Bond and insure the construction. h. Address federal, state, and local permitting requirements and the Secretary of the Interiors Standards for Historic Rehabilitation requirement; and i. Maintain a safe work site for all project participants. d. Project Timeline: The project timeline will be developed and approved during pre-rehabilitation services.