Specifications include, but are not limited to: 1. Coordinate all activities with the County Project Supervisor on a daily basis. 2. Not substitute from the agreed upon installation plan or repair method, as well as the equipment to be used without prior written approval from the designated Count Project Supervisor. 3. Ensure that all equipment operators (including subcontractors) are competent in the use of assigned equipment. 4. Ensure that all personnel (including subcontractors) are in uniform at all time and have on their body, all of the required identification required within the contract. 5. Maintain a clean and professional work environment at all times. 6. Use full-time permanent employees for the following: a. All PE services b. All BICSI/RCCD services c. All CADD services d. All GIS services e. All clerical services f. All ROW strand mapping, design and permitting g. All fiber optic cable installation h. All fiber optic cable terminating, splicing and testing