Specifications include, but are not limited to: The Project Development & Environmental (PD&E) study is to assess the future widening of Malabar Road from St. John's Heritage Parkway (SJHP) to Minton Road within the City of Palm Bay and in Brevard County. The project length is approximately 4 miles and the corridor does contain one bridge structure and four canal crossings over the Melbourne Tillman Water Management. The Study will consider all viable alternatives and alignments for the four-lane widening. The consultant will analyze and assess the potential impact on the social, economic, cultural, natural, and physical environment, to develop the preferred design concept of the project corridor in accordance with FDOT policy, procedures, and requirements. The engineering consultant shall review and become familiar with project corridor, all relevant documents and materials that have been prepared prior to the PD&E phase which includes a 2005 traffic study. The consultant will review the FDOT Efficient Transportation Decision Making Process (ETDM) Programming Screen Summary Report, including comments received from the Environmental Technical Advisory Team (ETAT), Lead Agency, and / or any responses from the FDOT District pertaining to this project. The consultant will review concepts and reports (e.g., typical sections, alignments, planning reports) developed from prior planning studies. The consultant will use resource agencies' comments to assess the level of effort for work activities required to adequately address potential resources of concern to this Project.