The project is to improve drainage on CR 162 and is funded through the Hazard Mitigation Grant Program (HMGP) DR 4177-31-A as approved by the Florida Division of Emergency Management and the Federal Emergency Management Agency (FEMA). The Work includes reconstruction and resurfacing the road, along with raising the elevation of the centerline of the road to prevent the road flooding during heavy rainfall events. Unsuitable areas will be removed and reconstructed as directed by the Engineer/Inspector. Grading and shoulder work will be performed as needed to restore positive drainage and as directed, pipes will be replaced as indicated on the plans. All pipes shall be cleaned and cleared of debris and soil, mitered ends added as indicated on the plans. Maintenance of traffic, sod, seed and mulch all disturbed areas not covered by sod, driveways, aprons, stormwater pollution prevention, grading ditches as needed to provide positive drainage, and other as directed by the Engineer/Inspector.