5.1. City of Stuart Pavement Maintenance Zone-2 Asphalt Mill/Overlay, Point Repairs and Micro Surfacing Project The project consists of milling a depth of 1.5-inch of existing asphalt, applying SP 12.5 asphalt overlaying of 1.5-inch, replacement of existing traffic loops, traffic monitors/counters, and required roadway striping of SE Amerigo Ave., SE Balboa Ave., SE Denver Ave., SE Detroit Ave., SE Florida Ave., SE Hospital Ave., SE Illinois Ave., SE Seminole St., SE Weir St., SE High School Ave., SE Luckhardt St. Micro Surfacing portions of SE Balboa Ave., SE Cortez Ave., SE Denver Ave., SE Detroit Ave., SE Georgia Ave., SE Palm Beach Rd., SE Riverside Dr. and required striping as well as, constructing twenty-one (21) point repairs within the Zone-2. Work shall include furnishing all labor, materials, and equipment to complete the work as specified and in accordance with the Florida Department of Transportation (FDOT) Standards (latest version), Florida Pavement Preservation Council (FPPC) Standards (latest version), City of Stuart Construction Standards, drawings, exhibits, specifications, and other contract documents. 5.2. Pavement Removal The unit price paid per square yard includes all costs for confirming the limits of saw cut and asphalt removal (constant depth and variable depth) and disposal of all asphaltic concrete material for all improvements called for in the Contract Documents and details, complete and in place. Contractor is responsible to repair any base material that is damaged during construction, at no additional cost to the City. Base material shall be proof rolled to locate soft and yielding areas. Any yielding areas shall be density tested and repaired per City Standards and should meet a minimum of 98% density per the modified proctor per AASHTO T-180, at no additional cost to the City.