The City of Boca Raton intends to install approximately 24,000 linear feet of water main ranging in size from 4” to 16” in the Chatham Hills neighborhood. Included with the water main replacement is abandonment of existing water mains, installation and reconnection of meters and service lines (on both public and private property), as well as roadway and sidewalk improvements. Furnishing all labor, materials, equipment, services and incidentals for all scope components are required for a complete and operating system. Maintenance of water service and coordination with operations are required. All Work shall comply with Contract Documents and permit conditions, and include all ancillary components, testing and restoration work as necessary.