Provide all demolition and new construction for the new Orange County Animal Services Facility. The construction shall be such that the existing facility remains operational and accessible by staff and the public during all construction activities. The site/civil work includes reconfiguring the existing stormwater retention pond, utilities, drives, parking, building plaza, site lighting, site sign and landscaping. The facility is a new two-story facility is to be used primarily for dog and cat housing, medical services, public and staff areas, intake areas and crematory. There shall also be a furniture, fixture and equipment package to be bid and installed by the contractor The new construction perimeter wall shall be a tilt-up panel system with steel beams and framings. The new roofing system shall be a Fully Adhered Thermoplastic Membrane Roofing meeting current energy and wind loading...