The project is generally to reduce hazardous wildlife attractants from within the Air Operations Area in 3 separate locations. • Area 1 – Base Bid o Located North of Taxiway B, south of Runway 9L-27R and directly west of Taxiway B7 o Work will include raising the grade of the area to prevent standing water and install catch basin, end sections and drainage pipe to promote drainage. • Area 2 – Base Bid o Located south of Taxiway B, north of Taxiway C and directly west of Taxiway B7 o This area will maintain the currently drainage pattern between two drainage pipes, while creating a better-defined ditch for better drainage. A new pipe will also be installed across Taxiway C. • Area 3 – Add Alternate No. 01 o Located southeast of Taxiway C, just north of Don Knight Lane within the airport’s AOA. o Currently trees are in this area, the project will clear and grub this area and re-grade to allow drainage to the north.