Specifications include, but are not limited to: The Capacity and Interchange Improvements for Florida’s Turnpike Mainline (SR 91) from Mile Post 265.3 to 269.7 (446579-1-32-01 & 452081-1-32-01). Also includes SR 408 from just east of the Old Winter Garden overpass, Turnpike Mainline (SR 91)/SR 408 interchange, Turnpike Mainline (SR 91)/SR 429 interchange to the ramp terminals and the SR 50 Ocoee connector along with associated improvements along SR 50 (452083-1- 32-01). A Collector/Distributor Systems will be added between the SR 408 and SR 429 Interchanges. The limits of FPIDs 446579-1-32-01, 452081-1-32-01 & 452083-1-32-01 of this Project are within the boundaries of Project Development and Environment (PD&E) study, FPID 444007-1-22-01 Widen Florida’s Turnpike Mainline (SR 91) from South of SR 408 to SR 50 (MP 263-273). The study is expected to be complete in November of 2023 and includes design recommendations for SR 91, SR 408 from just east of Old Winter Garden overpass, SR 408 and SR 429 system to system interchanges and associated local roads.