Provide all labor, equipment, permits, tipping fees and all other associated hauling costs to properly haul, process and dispose of Undigested Wastewater Cake 12%-18% Bio-solids Sludge, as specified, approximately 6,000 tons (10,000 cubic yards.) Provide all labor, equipment, permits, tipping fees and all other associated hauling costs to properly dewater using a mobile mounted centrifuge and haul or a per ton cost to haul, process and dispose of Undigested Wastewater Thickened 1%-1.5% Biosolids Sludge, as specified, quantity based on level of emergency. Monthly Rental/Lease Fee - Jockey Truck as described in Section D. The contractor shall provide a transport vehicle (jockey truck) that is fully D.O.T. compliant, power steering, clean, and well