A. Disconnect and removal of existing theatrical lighting system components included light fixtures, wiring, dimming rack, head-end control equipment, and wiring devices. B. Provide, install, and program a new theatrical lighting system. Provide a complete functional system with initial setup and programming. C. Provide and install completely new video projection system to include motorized roll down rear projection screen, projector, input ports, digital media switching and controls, and interface with existing theater audio system. D. Provide functional training to school staff for operation of new equipment. E. Contractor responsible for patching and painting areas that are damaged or become inconsistent due to demolition of equipment or wiring. F. All work shall conform to all local, state, and federal laws and regulations, Department of Education State Requirements for Educational Facilities, N.F.P.A. Standards, UL Standards, National Electric Code (N.F.P.A. 70), EIA/TIA Standards, OSHA Standards, and other standards listed in these specifications. G. All work described in this bid document and drawings prepared by MPS Engineering, Inc. H. The Contractor selected shall have a Florida Electrical "EC" or "ES" license.