SCOPE OF WORK: (Contractor must obtain and submit all permits prior to performing any work.) CONTRACTOR shall review all documents, specifications, and scope of work provided by MiamiDade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the WORK described in the contract documents including but not limited to: Scope of work to remove all pool filter system to replace with new, all chlorine related system and replace with new, all c/o 2 system and replace with new, all pump room structures to be removed and replaced with new, all electrical panels to be replaced to match existing pending design changes and replace with new, pool substrate resurfacing, pool substrate coping replacement, pool ladder handrail removal and replacement, pool deck drain replacement, pool bldg. full view windows and door facing pool deck.