Specifications include, but are not limited to: • Be responsible to become familiar with the permit and section requirements specified by the various Governmental Agencies and the Engineer. • Obtain all necessary permits such as; Dewater permits, Right of Way permits, Excavation/Fill permit(s), Fire Protection permit(s), and/or Underground Utility permit(s). • Be responsible for locating and verifying (horizontally and vertically) all existing utilities prior to the start of construction and for notifying the various utility companies (during standard business hours) to make the necessary arrangements for a relocation, temporary distribution service, or clarification of activity regarding said utility. • Not excavate, remove or otherwise disturb any material, structure, or part of a structure which is located outside the lines, grades, or grading sections established for this project, except where such excavation or removal is provided for in the contract, plans, or specifications. • Coordinate with the applicable electric utility regarding any necessary relocation(s) • Comply with all other requirements outlined in the engineering development plan, St. Johns River Water Management District permit, City issued permit and technical staff report.