The Project is located within Miami International Airport and will span portion between Concourses E and F, on ramp level one (1), in the existing Baggage Claim Area 14 and 15. In general, the work comprises of all materials, labor, services, supervision, tools, equipment, and all other necessary items for the construction, building mechanical and electrical modifications, which will facilitate: -DEMOLITION OF THE EXISTING BAGGAGE CLAIM UNITS AND ASSOCIATED BAGGAGE DROP, -DEMOLITION/REMOVAL OF EXISTING DOUBLE HOLLOW METAL DOOR AND EXISTING K1 DOORS ASSOCIATED WITH THE EXISTING BAGGAGE CLAIM UNITS AND STRUCTURAL INFILL OF EXISTING DOOR OPENINGS -DEMOLITION/REMOVAL OF EXISTING STEEL GUARD RAILS AND RECONFIGURATION OF EXISTING TUG DRIVE AS REQUIRED FOR THE LAYOUT OF THE NEW BAG DROP -NEW STRUCTURAL OPENING IN EXISTING WALL BETWEEN TERMINAL AND TUG DRIVE AREA AS REQUIRED FOR THE K1 DOOR FOR NEW BAGGAGE CLAIM UNIT -NEW BAGGAGE DROP BELT IN EXISTING TUG DRIVE AREA -NEW TERRAZZO FINISH IN THE AREAS UNDER THE EXISTING BAGGAGE CLAIM UNITS TO MATCH THE EXISTING TERRAZZO IN THE BAG CLAIM AREA, AND RESTORATION OF EXISTING TERRAZZO AFFECTED BY THE SCOPE OF THE PROJECT -NEW WALL FINISHES IN THE PASSENGER BAG CLAIM SIDE TO RESTORE THE EXISTING WALLS AFFECTED BY THE REMOVAL OF THE EXISTING BAGGAGE CLAIM UNITS -REMOVAL OF EXISTING COLUMN COVERS AND INSTALLATION OF NEW COLUMN COVERS IN THE PASSENGER BAG CLAIM AREA -REMOVAL AND REPLACEMENT OF EXISTING CEILING AT PASSENGER CLAIM AREA AS REQUIRED FOR REMOVAL AND INSTALLATION OF FIDS AND BIDS -NEW ELECTRICAL AND SECURITY SYSTEM UPGRADES AS REQUIRED FOR NEW BAGGAGE CLAIM UNIT OPERATION, NEW LIGHTING IN TUG DRIVE AREA AS REQUIRED FOR NEW LAYOUT OF BAGGAGE DROP -NEW EXIT LIGHTS AND FLOOR MARKINGS ASSOCIATED WITH THE NEW PATH OF EGRESS ASSOCIATED WITH THE NEW CONFIGURATION OF THE TUG DRIVE AND BAG DROP AREA.