Specifications include, but are not limited to: 1. The selected Bidder shall perform swale liner maintenance, including, but not limited to weed removal and edging using equipment, debris removal, and repair or replacement of loose or damaged liner, in accordance with the Monthly Schedule issued by the Project Manager, or their designee.; 2. The Contractor shall perform work in accordance with the Monthly Schedule issued by the Project Manager, or his/her designee.; 3. The Contractor shall deliver daily VIA email, facsimile, or in person, a detailed work schedule to identify the specific work in progress to the Project Manager or their designee.; 4. Hours of Service - Work shall be performed by the Contractor between (seven) 7:00am and dusk, Monday thru Friday. Work shall not be performed on Saturday or Sundays unless specifically authorized in writing by the Project Manager. The Contractor will not be allowed to work during any City recognized holiday without prior written notice.; 5. Maintenance of Swale Liners - 5.1 If the liner is under water, the City suggest that the Contractor start at the outfall and work their way back to the beginning of the block, this will alleviate any blockage in the liner, however, the Contractor is responsible for the methods and means to perform this scope of work.; 5.2 Contractor shall edge the liner during each rotation.; 5.3 Contractor shall weed eat along the liner if necessary.; 5.4 Contractor shall shovel out and remove any and all debris i.e. sand, grass clippings, & debris from all the liner. At the end of each daily work shift, all accumulated material must be dumped at the City designated site unless prior approval by the Project Manager or their designee to temporarily leave along the City right of way is authorized. If the City allows overnight storage of material, they are to be secured with DOT reflective cones. The site must be restored to equal or better condition, which may require replacement sod within twenty-four (24) hours. This decision will be at the Project Manager or their designee’s discretion.; 5.5 The City will provide the site where debris shall be hauled to. The Contractor will be required to provide cubic yard reports of debris removed at the beginning of the following work week.