All work for the Project shall be constructed in accordance with the Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering and installing all materials, equipment and services, including labor for the Work, which generally involves the following activities: For the Surface Depression Repair Project, work involves restoring depressions evaluated in the Geo-Tech reports below: 1. Report No. 25-1729.124.1 Surface Depression at NE 10th Street 2. Report No. 25-1729.126.1 Surface Depression at Copeland Community Park - Priority 3. Report No. 25-1729.127.1 Surface Depression at Jim Legrone Memorial Park - Priority Restoration recommendations are outlined in each report and the reports are included in section 00900 of these bid specifications.