Specifications include, but are not limited to: The Town of Fort Myers Beach is a seaside community with a permanent population of about 6,000 that increases to approximately 40,000 during the winter season. The Town is approximately 7 miles long with the Gulf of Mexico to the west and the Estero Bay to the east. The Town seeks to hire a contractor to perform stormwater maintenance and repair. The Proposer shall furnish all materials, tools, supplies, heavy equipment, vehicles and labor necessary for the maintenance, repair and televising and video recording of all stormwater drains. The Proposer shall bear all costs associated with the Project. Stormwater cleaning shall be performed with hydraulically propelled or mechanically operated cleaning equipment. Selection of equipment shall be based on field conditions, taking into account all relevant factors such as, by example and not limitation, type and quantity of debris to be removed, size of pipe, depth of flow and the like. Television inspection and video recording of all sewer and storm drains shall be required for the documentation of various field conditions and activities as directed by the TOWN’s representative. Stormwater pipe joint sealing shall be accomplished by the injection of chemical sealing materials into and/or through the joints from within the pipe.