Specifications include, but are not limited to: This project can be generally described as the Rehabilitation of the South Apron at Winter Haven Regional Airport (GIF). Due to the age, condition, and thickness of existing asphalt, all of the existing asphalt is proposed to be removed to the top of the aggregate base course. The base course will be reworked and graded to meet grading and drainage requirements. A prime coat will be applied to the prepared base course and then two lifts, each of 2-inches in thickness, of asphalt will be paved to grade. A tack coat will be applied between lifts. The existing drainage inlets and pipes will be evaluated and are anticipated to require removal and replacement due to the age of the infrastructure. A 10’ wide perimeter around the existing apron will be stripped and sodded for erosion protection. Temporary and permanent apron markings are required. No electrical or geometric improvements are proposed in this project. The project excludes the 50’ of apron closest to tenant hangars from FAA funding eligibility.