The Base Bid includes but is not limited to electrical demolition, electrical installation, replacing the existing access control system, and integration with existing security cameras through a video management system. Also included in the Base Bid scope is the relocation of some existing security cameras and data boxes as well as the installation of a new intercom system. Bid Alternatives include but are not limited to electrical demolition, electrical installation, chain link fence replacement, vehicular gate replacement and/or upgrades, pedestrian gate replacement, addition of access control at gates not currently on the Airport’s access control system, fiber installation, security cameras, bollards, and concrete sidewalk.