In all cases Contractor requires to supply new COHB Bus Shelter structures, relocation of irrigation systems and bus signs, landscape restoration, implementation of maintenance of traffic plans, coordination with franchise utilities, and all necessary work to complete the project. The CONTRACTOR shall furnish all labor, materials, equipment, tools, incidentals, and transportation which are necessary for the proper layout and completion of the work, as specified herein and shown on the design plans. The work includes: • Demolition & Removal of Existing Bus Stop Pads and Sidewalk • Irrigation Repairs/Relocations • Construction of Bus Shelter Pads • Installation of Solar Powered Bus Shelters and Furnishings • Sodding of Disturbed Areas • Erosion and Sediment Control • Survey Work Required for Establishing Proper Layout, Elevations and Grades • Maintenance of Traffic