• Replacement of all windows and doors. Includes removal of existing hurricane shutters. • Demolition of the interior spaces to include dormitories, restrooms, kitchen, bathrooms, suspended ceilings both gypsum and acoustic, partial selective roof truss demo. • New bunker locker equipment manufactured by GearGrid, contractor to provide and install. • New interior partitions, to include all finishes to walls, floors and ceilings. • New bathrooms to include all wall/floor/ceiling finishes, toilet partitions, new plumbing fixtures, wall mounted fixtures, mirrors and new light fixtures. • All Stainless-Steel Kitchen cabinets with new stainless appliances provided by the contractor. • New security access card readers at marked locations to include new wiring and programing of new devices. • Painting throughout the station of all interior/exterior as per finish schedule. • Exterior work to include but is not limited to the following: All stucco patching, painting, exterior patio demo, concrete slabs, flatwork, asphalt work, asphalt striping, curbing, demo selective roof sections, new patio enclosure, new landscaping/sod/sprinklers, site lighting, new roof trusses with new roofing at selected locations, new structural slab/footings/columns, new flagpole. • New Mechanical/Electrical/Plumbing/LP gas as per approved plans. • Contractor to include in their proposal the site preparation which includes but is not limited to electrical connections/water & sewer connections, concrete curb removal, asphalt repairs as needed in order to receive MDFR provided trailers/mobile port-o-lets/showers. The contractor is to refer to plans for locations of site prep. GC to coordinate and confirm final locations with MDFR Project Manager. • Contractor to provide and install new canvas awning at temp trailer locations. • CONTRACTOR IS TO PROVIDE ELECTRICAL AND PLUMBING CONNECTIONS TO ALL TEMPORARY FACILITIES • CONTRACTOR TO REFERENCE SITE PLAN SHEET A1.0 FOR LOCATIONS OF TEMPORARY FACILITIES. • THE CONTRACTOR IS TO PROVIDE ELECTRICAL AND PLUMBING CONNECTIONS TO ALL TEMPORARY FACILITIES. • ELECTRICAL CONNECTIONS FOR TEMP FACILITIES ARE TO TIE INTO THE STATIONS EXISTING ELECTRICAL PANEL. • PLUMBING WATER CONNECTIONS FOR TEMP FACILITIES ARE TO TIE INTO THE STATIONS EXISTING WATER SUPPLY. • CONTRACTOR IS TO INCLUDE IN PROPOSAL THE CLEANING AND PUMP OUT OF TEMP BATHROOMS AND SHOWERS FOR THE PROJECT DURATION. • All work within the plans and specifications will be inclusive of all labor, materials and equipment to complete said scope.