The Contractor has the option to submit bids for one or more project phases or any combination of project phases: • Magnolia Dunes, Phase 1 • Magnolia Dunes, Phase 2 • Atlantic Oaks Circle, Phase 1 • Atlantic Oaks Circle, Phase 2 Only one bid package shall be submitted per Contractor. The work consists of furnishing all labor, materials, and equipment required to construct the Contract Documents as per signed and sealed construction plans/technical specifications and permits provided as the Exhibits of this invitation to bid. All work performed shall conform to the relative sections of St. Johns County Land Development Code, City of St. Augustine Beach Codes and Ordinances, and all associated construction standards and details (Latest Revision). In the event a situation is encountered that is not addressed in the St. Johns County Land Development Code or City of St. Augustine Beach Codes and Ordinances, then the most current edition of the following FDOT Publications shall prevail: • Standard Plans • Standard Specifications • FDOT Design Manual • FDOT Flexible Pavement Design Manual • FDOT Utility Accommodation Manual Should a conflict arise between the construction specifications/details shown in the Construction Plans/Technical Specifications and any of the above referenced standards, the Contractor shall immediately confer with the City Engineer and/or his/her designee to resolve the discrepancy. MEASUREMENT AND PAYMENT No separate measurement or payment will be made for any work required to construct the work in the Contract Documents, including but not limited to demolition, clearing, excavation, grading, earthwork, formwork, , filling and leveling, and asphalt or brick paver or concrete placement. No separate measurement or payment shall be made for any activities that encroach, impact, or otherwise affect any endangered, threatened, or otherwise protected species. No allowance shall be made for the restoration, relocation, fees, fines, or payments required to mitigate any impacts to such. All costs required to construct the Contract Documents shall be included under the relevant base bid item.