Specifications include, but are not limited to: The CONSULTANT is to conduct a PD&E Study for SR 297 (Pine Forest Road) and CR 297 (Pine Forest Road) in Escambia County, to consider widening from a three-lane to a four-lane typical section. The approximate limits of the project are on SR 297 (Pine Forest Road) from south of SR 8 (I-10) (MP 3.012) to north of SR 10 (US 90A) Nine Mile Road (MP 4.294) and continued on CR 297 Pine Forest Road from SR 10 (US 90A) Nine Mile Road (MP 0.000) to north of SR 297A (MP 0.279). Project limits may be adjusted. This project will be studied with deliverables produced over four phases. The CONSULTANT will analyze and assess the Project's impact on the social, economic, cultural, natural, and physical environment, in order to develop the Location and Design Concept of the Project in accordance with FDOT policy, procedures, and requirements.