This project consists of the resurfacing and/or reconstructing in portion or whole of various roadways within Escambia County. The project will include work associated with the reconstruction of roadways such as maintenance of traffic, stormwater pollution prevention, sod stabilization shoulder work, pavement striping including reflective pavement markers (RPM), etc. The contractor is to maintain traffic flow at all times with minimal delays. Roadways are to have two-way traffic opened during all non-working hours. Lane closures will be granted by County staff during working hours. The contractor shall resurface 65th Ave. and 49th Ave. during non-school hours. The Escambia County Road Department will retain Thirty (30) loads of millings from this project. Escambia County will provide trucks to haul the Thirty (30) loads of millings from the jobsite.