Specifications include, but are not limited to: 2) Remove and properly dispose of existing Electrical Meter Enclosure. 3) Remove and properly dispose of interior Load Distribution Panel. 4) Provide and install new Meter Enclosure, mast and weather head and related insulators/components as needed with integrated Main Distribution Panel. ; Install new Main Service Disconnect, new Main Breaker for Interior Sub-Distribution Panel. New Exterior Panel must have multiple open slots for circuits for HVAC Heat Pump, New GFCI Outlets, Smoke/CO Alarms and any other new NEC 2014 compliant circuits ; 1) Provide and install complete new Mini-Split HVAC System or Central HVAC System, as appropriate for whole home. ; Main living room, dining room and bedrooms are primary areas to be serviced. Kitchen and bathroom are to be addressed in the most logical way possible. This home does not have attic space. 4) Coordinate with GC and Electrician for all required electrical needs. ; 1) Remove and properly dispose of old window and wall A/C units. 2) Coordinate with installation of new HVAC System into home.