The project will include tasks and activities such as, but not limited to, engineering, design, survey, technical specifications, permitting, inspection and grant funding support necessary to construct the wellfield expansion. The design services rendered during this project shall result in a complete, functional, and operable project. The project includes the following main elements: Provide a detailed project execution plan indicating how the process expansion will occur without negative impact to existing facility operations. The plan should include a detailed schedule and address roles and responsibility for design activities and should be critical path based. • Groundwater and solute transport modeling of the regional UFA. • Production well appurtenance design. • Raw water transmission main modeling, design, and construction. • Fiber optic network design and PLC integration with existing assets. • Develop and submit all necessary permitting. ..