Specifications include, but are not limited to: Demo entire interior of building, including floor coverings, ceilings, light fixtures, HVAC ductwork, and HVAC equipment. Existing communication/electrical closet to be separated into twostand-alone rooms with adequate space and access. Upgrade fire alarm panel and associated components. Provide for new mechanical room (current air handlers are in the ceiling, to be relocated to new mechanical room. There is an additional air handler in a classroom that will also need to be in this new mechanical room). Provide for a conventionally partitioned hallway through the building, similar to the current configuration. Hallway to have permanent doorways for access to 8 classrooms similar to existing configuration. Provide for retractable partitions for 7 smaller classrooms similar to existing. Provide for all new vinyl framed, insulated, fixed Low-E windows, tinted. Provide for 2” blinds at each window.Spray foam the existing roof deck with minimum R30. Install 1 5/8” metal Z-furring, 1 ½” rigid foam insulation and 5/8” drywall on the inside of the exterior walls.