Surveying • Boundary survey of the new plant site and other plant sites • Topographic surveys, including overhead and underground utilities, of the new plant site and existing plant sites Environmental • Phase 1 environmental assessment • Wildlife survey of endangered/threatened/protected/listed species. Geotechnical • Geotechnical survey for structures and stormwater pond design. Site Improvements • Site paving, grading, drainage, & utilities • Landscaping & irrigation • Site lighting, security, & electrical systems Buildings • On-site office and plant buildings design Plant Improvements • 0.6 mgd Phase I wastewater treatment plant, with provisions for expansion to 1.2 mgd, and ultimately, 1.8 mgd, over an anticipated three phases of design and construction. Final wastewater process is to be determined in coordination with City staff. • Yard piping • Headworks with screening and grit removal • Biological Treatment Process • Solids Settling • Filtration • Disinfection Improvements • Solids Treatment, Dewatering and Handling • Reclaimed Water Storage • Reclaimed Water Pumping • Electrical and controls • SCADA system