CONTRACTOR shall review all documents, specifications, plans and scope of work provided by Miami-Dade County Parks, Recreation, and Open Spaces Department for work to be completed and furnish all labor, equipment and materials required to: a new playground area. The playground equipment for kids from 2-12 years old, Engineered Wood Fiber Surface (EWF), concrete curbing and walkways, benches, bike racks & trash receptacles; as well as nature play elements. Site preparation, earthwork and earth mound with planting and Poured in Place playground surface is also specified and detailed in the construction documents. Also included is the installation of new trees, sod, irrigation and plant material and the subsequent restoration of all areas, including walkways and lawns, which may be damaged during the construction process. 1) Contractor responsible for verifying underground utilities. 2) Playground construction site access will be from 192nd Street. 3) Contractor to coordinate work with adjacent Recreation and Aquatic Center project with regard to new FPL Transformer and secondary feeder ductbank running under entrance plaza slab.