Civil engineering services relating to the construction engineering and inspection (CEI) for sidewalk construction, boardwalk, minor roadway, sidewalk, driveway, contractor administration, and minor drainage improvements on two roadways in Leon County. The scope of this project will include the following improvements: Project A: FDOT FPID: 449703-1-58-01. Construction of a 5’ sidewalk along the north side of Canyon Creek between the St. Marks Trail and Shumard Oaks in Leon County, Florida. Project B: FDOT FPID: 451724-1. Construct 5’ and 6’ sidewalk along Old St. Augustine Road in two segments. Segment 1 – Winchester Lane (end of Lafayette Street) to 580’ west of Blair Stone Road intersection, south side Segment 2 – 540’ east of Blair Stone Road intersection to Paul Russell Road, north side.