• The Contractor shall provide the necessary materials, equipment, and labor associated to furnish, deliver and install (2) 8’x20’ New Proposed High Cube Steel Containers, manufactured (subcontracted), assembled and delivered by the contractor; with new assemblies, anchoring details, as well as Mechanical & Electrical details shown herein contract drawings. Nonetheless it’s the contractor’s responsibility to field measure and verify each existing project notes and components associated with this project scope of work. Contractor to provided min. 4” concrete reinforced slab for containers. Contractor to refer to plans and specs regarding interior/exterior finishes and necessary equipment i.e. HVAC, Electrical, (see exercise room equipment schedule for list of GC provided exercise equipment). Note, window(s) and doors on the containers must have NOA’s and have Miami Dade County product approval. Compaction testing and termite treatment to the new slab is by contractor. Compaction reports and termite certificate are to be provided to MDFR project manager. • All electrical conduits within the containers are to be concealed. Surface mounted conduits are not permitted or accepted. • New HVAC units to be mounted on exterior welded heavy duty, 2” min. steel angles, painted with rust proof epoxy paint.