The work in general consists of the complete fabrication and installation of new Metal Picket Fence & pedestrian gate, along the front area of the MDFR Headquarters property, see details in project contract drawings sheets A1.01 and A6.12. This scope of work also consists of the new fabrication and installation of Storefront North Main Building Entrance as well as the South Rear Building Entrance to be fabricated in 1” thick Level-3 Ballistic resistance glazing storefront manufactured by “Riot Glass” Model # AP2-SF-HD (AP100 1”) ArmorPlast Gen II Storefront Security System, Heavy Duty Conversion Series or approved equal. For more project detail and complete scope of work, make reference to the project contract drawings “BID SET” prepared by Angel C. Saqui, FAIA, Architects; consisting of (8) sheets A0.01, A0.02, A0.03, A0.04, A1.01, A6.11, A6.12, A6.13. The scope is to be inclusive of removing the existing Storefronts (Front & Rear) with all the ancillary accessories accompanied…i.e. Kantech card reader systems, door sensors, electric door strikes, all existing doors hardware & Lock systems to be replaced with new (refer to plans and specs for details in door & window schedule remarks), etc. All existing front & rear Roll-up hurricane shutters are to remain as is; do not disturb or damage, if so it’s the contractor’s responsibility to replace the entire section of damaged Roll-up shutter at no additional cost to MDFR. The contractor is to refer to plans and specifications provided with the RPQ and Bid documents.