Specifications include, but are not limited to: Contractor shall provide all materials, equipment, permitting and supervision necessary to repair the first seven bents and six spans (approximately 133 linear feet) of the existing Upper Concrete ”T” Dock at Lignumvitae Key, shall repair spalled areas, demolish and replace the severely damaged Double T panels, and re-construct as shown in the construction documents, and on Sheet S102. All lumber to be pressure treated wood #2 SYP, or better. All repair work to be done within the same footprint as a portion of the existing concrete dock. Existing Upper Concrete “T” Dock piles are to remain and be reused. Provide ADA Compliant Handrail where slopes are 1:20, or greater.