Specifications include, but are not limited to: Site Works, Site Grading, Landscaping, Irrigation, Playground Equipment and surfacing. The scope also includes the demolition of the existing playground and surfacing, removal of existing benches, demolition of part of the existing sidewalk and relocation of several trees. Also included is the installation of playground equipment procured by the Contractor and installation of new concrete slabs for furnishings and drinking fountain. Contractor shall also construct the concrete containment curb as shown and install the drainage rock and EWF as documented. Contractor will procure and install Site Furniture such as benches, litter receptacles, and boulders per the contract documents (boulders to be approved by the Landscape Architect). Site preparation, earthwork with boulders and the elevated slide mound are also to be constructed per specifications and details in the construction documents. Also included is the installation of new trees, shrubs, sod, irrigation and the subsequent restoration of all areas, which may be damaged during the construction process.