Demolition of existing concrete apron, asphalt pavement and old airfield lighting vault; construction of new concrete apron and taxiway pavements; construction of new asphalt pavement for shoulders and vehicle service roads; construction of a new storm water collection system including underdrains and cleanouts; removal of existing and installation of new pavement underdrains within the pavement demolition limits; modification of existing Taxiway V to become apron-edge Taxilane V, and addition of parallel bypass taxiway; installation of new pavement markings; removal and relocation of existing elevated taxiway/apron edge lights; relocation of airfield signage; relocation of the Federal Aviation Administration (FAA) Surface Weather Sensor; replacement of FAA power and communications service to the FAA Remote Transmit Receiver; sodding of disturbed areas.