Specifications include, but are not limited to: 1. WALERS - remove and replace walers on docks North 2 and North 3 - replace all weathered and damaged boards - a. SPEC - SYP CCA #1 - 4”X10” walers w/shear plates and split rings b. Exception of approximately 64’ of new waler on North 2 2. COVERBOARDS - remove and replace all on docks North 2 and North 3 a. 2”X10”X12’, approximately 696 feet total b. SYP CCA #1 3. RUB RAIL - remove and replace all rub rail- North 2 and North 3 a. Including Universal corner pieces b. Match similar to dingy dock rub rail 4. INTERNAL PILE GUIDES - a. Replace a total of 3-4 complete guide sets as needed - b. Spec- 18” galvanized steel with internal rollers c. Replace and reconnect connection bolts as needed- connection bolts are missing; pile guides and roller housings are slipping. Approx. 5 pile guides to be addressed for this issue. d. Remove excessive rust on nuts, plates and internal pile guide frame