The Project, including mobilization and demobilization, consists of furnishing and installing approximately 500 linear feet of 10-inch and 370 linear feet of 12-inch PVC C900 pipe and zinc coated polyethylene encased ductile iron fittings for a sewage force main along Venetian Way between 850 N Venetian Dr and 920 N Venetian Dr West of PS-0058; abandonment in place and grout filling of approximately 497 linear feet of 10-inch and 368 linear feet of 12-inch DIP force main. Project also includes exploratory digging and restoration for 10-inch and 12-inch DIP FM connections; three (3) 10-inch and three (3) 12-inch plug valves; making two (2) cut-in plug connections to an existing sewage 10-inch DIP force main and two (2) cut-in connections to an existing sewage 12-inch DIP force main and one (1) cut-in connection to an existing sewage 16- inch DIP force main through a reducer; mechanical joint restraints; furnishing and constructing automatic air release valves assemblies for sewage force mains; polyethylene encasement for ductile iron valves, fittings and restraints; sheeting and shoring ordered left in place by the Engineer; additional suitable backfill, if needed; furnish all materials, equipment and supplies necessary for cleaning and testing the main; cutting, dewatering; removal of existing asphalt pavement, sidewalk and sod; removal, transport, salvage, and legal disposal of demolition material; protection of existing trees; temporary and permanent replacement of any pavement, sidewalk, sod, landscaping and pavement markings damaged by the construction of the Project and all other appurtenant and miscellaneous items and work for a complete and fully functional installation, including installation of a temporary construction fence to prevent park users from accessing any part of the construction zone or staging zone. All fencing shall be coordinated with the park owner.