1 Survey (Layout & As-Built) 1 LS 2 Mobilization 1 LS 3 Turbidity Barrier Installation & Maintenance, Including Temporary Signage, Regulatory Turbidity Monitoring & Reporting 156 LF 4 Clearing and Grubbing (Includes removing and disposal of all damaged boardwalk , including damaged railings, hardware and water line) 1 LS 5 10" DIA, 20 Ft S.Y.P Marine Grade per ASTM D25 Treated Timber Pile 6 EA 6 6" x 6" PT Timber Post, S.Y.P. Marine Grade, Minimum Embedment of 2.5 Ft 2 EA 7 Furnish and Install Aluminum Picket Handrail, Match Existing 100 LF 8 Wooden Boardwalk/Fishing Pier Construction, Including bents, joists, deck boards, bracing/blocking, through rods, Simpson Ties, Bituminous Liner, and all hardware. Apply Loctite 271 to all new through rod nuts. 400 SF 9 3/4" PVC Water Service restoration to the fish cleaning station, includes couplings, mounting hardware and clamps. 65 LF 10 Educational Signs and Monofilament Recycling Bin with Stickers (6" PVC) (Furnish and Install) 1 LS