The Contractor shall provide the necessary permits, materials, equipment, and labor associated to furnish, deliver, assemble and upgrade existing private pump station located at 9300 NW 41 Street, Headquarters Building to Miami-Dade Fire Department (MDFR) as show on drawings prepared by Robayna and Associates and AMA Group (EOR). The scope of work involves the replacement of two existing 20-horsepower pumps and their corresponding controls with two 11-horsepower pumps. The contractor shall ensure that bypass pumping is maintained to preserve the full functionality of the pumping system during construction. Contractor shall submit to EOR and MDFR a plan outlining sewage “By-pass” for review and approval prior to commencing work. The contractor must verify piping, connections, and new sewer structures before abandonment and ordering proposed piping/fittings. Contractor shall notify the EOR and MDFR of any discrepancies with the Project drawings prepared by Robayna and Associates and AMA Group. Existing 6” Force main to be abandoned in place and install new 4” PVC C-900 force main see sheet C-502 & C-503 of contract drawings. Existing Control panel and controls to be removed. Refer to Electrical drawings E-1 thru E-7 for electrical plans. Pump, discharge piping and valves to be removed and replaced. The installed pumps must be explosion proof & capable of handling wipes and rags as per M-101. Provide 6’-0” chain link Fence and 6’-0” x 12’-0” double swing gate as show on C-301. Contractor to provide labor, material, transportation and equipment and perform all operations associated and required to achieve the completion of the exterior site plan improvements herein specified. Contractor to follow and comply with the requirements listed on the RPQ and contract Project plans at all times. Contractor is responsible and required to comply with all requirements according to the Miscellaneous construction contract MCC-7360-PROGRAM. Additional work includes, but not limited to: Electrical Contractor to provide and install All Electrical work including but not limited to associated with the proposed Project contract drawings. Contractor shall be familiar with the Project contract drawings as well as the Project site. All Electrical installation work shall comply and meet all standard requirements of the NEC, FBC and any other applicable Federal, State and local codes. Install all required underground conduits including new grounding system. Provide new concrete pad. new main disconnect, new control panel and new motor connection box, etc. as per Electrical Plans. Plumbing / piping. Contractor to provide and install all plumbing work associated with the approved Project drawings. Contractor shall be familiar with the Project contract drawings as well as the Project site. Plumbing installation work shall comply and meet all standard requirements of the NFPA, IFGC and NFGC.