1. Clean-up and removal of trash and debris. All construction debris shall be removed from the site by the contractor and disposal shall be at the proper dumping site. Contractor shall not dispose of any construction debris at the site dumpster. HCD shall not be responsible for dumpsters provided by contractor. 2. Clean surfaces of all dirt, dust or other contaminants, which adversely affects adhesion of paint or appearance of finish. 3. Patch and repair all deteriorated walls and ceilings to match existing. Contractor shall ensure that remaining surfaces are in sound condition throughout the entire unit, first and second floors. Contractor to remove all wallpaper on walls, doors and/or ceilings, provide a smooth finish and paint. Where required Contractor shall block and patch any damage to exterior surface. Stucco finish to match existing texture and color. Any irregularity on the wall shall be brought to the attention of the HCD Project Manager for evaluation.