1. Clean-up and removal of trash and debris. All construction debris shall be removed from the site by the contractor and disposal shall be at the proper dumping site. Contractor shall not dispose of any construction debris at the site dumpster. PHCD shall not be responsible for dumpsters provided by contractor. 2. Clean surfaces of all dirt, dust or other contaminants, which adversely affects adhesion of paint or appearance of finish. 3. Patch and repair all deteriorated walls and ceilings to match existing. Contractor shall ensure that remaining surfaces are in sound condition throughout the entire unit, first and second floors. Contractor to remove all wall paper on walls, doors and/or ceilings, provide a smooth finish and paint. Where required Contractor shall block and patch any damage to exterior surface. Stucco finish to match existing texture and color. Any irregularity on the wall shall be brought to the attention of the PHCD Project Manager for evaluation. 4. Due to condensation and moisture intrusion damage to drywall on ceiling and/or walls may be found and replacement of damaged drywall could be necessary. Where mold is found contractor shall clean and sanitize the areas that have experienced moisture intrusion and treat the affected area with products approved for treatment of mold. Contractor shall apply chemicals following manufacturers’ recommendations and required by present laws, codes, regulations and/or guidelines. 5. Contractor shall properly seal, caulk, patch up and plaster as needed. Repair damaged areas throughout the entire unit (holes / damaged gypsum board). (First and second floor, if apply). 00800 - Page 2 of 7 Revised 9/22/2023 Patching shall be neat, to match existing contiguous areas and shall produce surfaces suitable for new materials. Contractor shall ensure that remaining surfaces are in sound condition throughout the entire unit. 6. Contractor shall provide the sq. ft. of insulation missing in the attic/wall areas, Refer to the Unit Price Table. 7. Paint interior of the unit with two (2) coats of paint, Sherwin Williams or an approved equal. Application of color shall provide complete coverage, uniform color, desired sheen and accepted texture. When new drywall is installed, contractor shall apply one coat of primer and two coats of base paint. a) Interior Walls Color: SW 7566 Westhighland White b) Finish: Semi-Gloss c) Ceiling Paint: Pro-Mar 400 Flat White 8. Provide wood shelves. Repair or replace and paint, existing wood shelves and clothes rods in all closets throughout the units where requested. 9. Contractor to install new vinyl tile on top of existing finish floor unless otherwise noted. Mohawk Long Bien 2.0 Mascarpone 7” x 48” LVT or approved equal. Contractor to repair all floors’ surface to a smooth finish before installing new vinyl tile. Refer to the Unit Price Table. Coordinate with PHCD Project Manager Design and color of the new tile. Provide sample to PHCD Project Manager for approval prior to order from manufacturer. 10. Contractor to wax and buff all floor surfaces.